Realized projects
Whether it's a digital twin, digital tracking systems or BIM2LOG: Our toolbox is packed to the brim. Read how construction sites become buildings.
KSB Agnes
By linking the BIM model with deadlines and resources, all transport processes were precisely coordinated with hospital and company traffic at KSB.
CTB Clara Tower Basel
Problems with bottlenecks on the construction site? Thanks to a digital twin, you can build more efficiently and close information gaps with BIM2LOG.
Migros Zurich
Migros shops have to be remodelled quickly. Time-optimised planning and construction (TOPB) can cut the construction phase in half. The result: lower costs and satisfied customers.
pRED Roche Basel
The construction of the Roche pRED Research Center is a mammoth project in the middle of a residential area in Basel. Thanks to just-in-time, we have massively increased efficiency.
KSSG — OKS Spital St.Gallen
The St. Gallen Cantonal Hospital and the Eastern Switzerland Children's Hospital were expanded with a modern new building while hospital operations continued. Emergency room access, foot traffic and REKA approach had to be taken into account when planning the construction process. A particularly exciting operation for us.